Solutions

Covering Multiple Application Scenarios, Providing Customized Data Center Liquid Cooling Solutions

🤖

AI Data Center Liquid Cooling Solutions

30-150kW per cabinet, Responsense <100ms, PUE≤1.15, compatible with GB 200/300

CoreChallenges

  • Single cabinet power 30-150kW
  • GPU transient Responsense <100ms
  • Liquid cooling system verification complexity

SolutionsFeatures

  • 10-1000kW liquid cooled loadbank verification
  • CDU ±0.5°C Temperatureerature control
  • Intelligent monitoring system
Contact Us for Details
🏦

Financial Data Center Liquid Cooling Solutions

99.999% availability, leak detection ±1m, GB50174 Class A standard

CoreChallenges

  • 99.999% availability
  • Zero business interruption retrofit
  • Financial compliance audit

SolutionsFeatures

  • N+N/2N redundant architecture
  • Distributed leak detection
  • Phased construction
Contact Us for Details
🔬

Supercomputing Center Liquid Cooling Solutions

10-50MW scale, SCADA monitoring, free cooling + waste heat recovery 60%+

CoreChallenges

  • 10-50MW large scale
  • Cooling uniformity ±1°C
  • PUE &lt; 1.2

SolutionsFeatures

  • Distributed CDU architecture
  • SCADA intelligent monitoring
  • Free cooling + waste heat recovery
Contact Us for Details
☁️

Edge Computing Liquid Cooling Solutions

2-hour deployment, IP54/IP55, -40°C to +55°C, 5000m altitude

CoreChallenges

  • Wide distribution, difficult maintenance
  • -40°C to +55°C wide temperature range
  • 4G/5G remote monitoring

SolutionsFeatures

  • Factory prefabricated
  • IP54/IP55 protection
  • Predictive maintenance
Contact Us for Details
💧

Immersion Cooling Solutions

200-500kW per cabinet, PUE≤1.02, coolant recovery rate 99%

CoreChallenges

  • 200-500kW ultra-high density
  • High coolant cost
  • Operations training

SolutionsFeatures

  • Single/two-phase optional
  • 99% coolant recovery
  • TCO reduced by 40%
Contact Us for Details
🔄

Air-to-Liquid Retrofit Solutions

Zero business interruption, PUE 1.6 to 1.2, lightweight reduction 40%, ROI 2-3 years

CoreChallenges

  • Zero business interruption
  • Building load-bearing limits
  • Return on investment period

SolutionsFeatures

  • Phased construction
  • Lightweight design
  • Hybrid operation transition
Contact Us for Details

Service Process

1

Requirement Communication

Understand customer specific requirements

2

SolutionsDesign

CustomizedLiquid CoolingSolutions

3

Product Supply

Provides liquid cooling equipment

4

Installation and Commissioning

On-site installation guidance

5

Operation and Maintenance Support

ContinuousTechnology Support

Need Customized Solutions?

Our engineering team will analyze your specific needs and provide full-range services from solution design to implementation